Westlands Apex Commercial Tower & Multi-Level Basement

Client: Simba Capital Developments Ltd

18-storey Grade-A commercial office tower featuring post-tensioned flat slabs, central shear wall core, and a 3-level contiguous bored pile basement retention

Westlands Apex Commercial Tower & Multi-Level Basement

Project Overview & Structural Scale

Situated in the heart of Westlands’ rapidly densifying financial district, the Westlands Apex Commercial Tower is an 18-storey landmark development offering 26,000 square meters of Grade-A office space and three subterranean parking basements accommodating 340 vehicles. SBMR was retained as Lead Structural Engineer and Resident Site Supervision Consultant from initial schematic design through final statutory handover.

Geotechnical & Basement Shoring Engineering

Excavating an 11.5-meter deep basement footprint directly adjacent to Chiromo Lane and neighboring multi-storey buildings required zero-tolerance soil retention. SBMR engineered a contiguous bored secant pile wall utilizing 600mm diameter reinforced concrete piles drilled into weathered Nairobi trachyte bedrock, backed by two tiers of pre-stressed ground tieback anchors. Groundwater was safely managed through deep well vacuum dewatering, protecting adjacent foundations against settlement.

Superstructure Innovation & Material Optimization

To eliminate internal columns and provide expansive, unobstructed floorplates for corporate tenants, the structural design incorporated 250mm thick post-tensioned (PT) unbonded flat slabs spanning up to 10.5 meters. The primary lateral load resistance is provided by a dual central core shear wall system designed according to Eurocode 8 for seismic response factors appropriate for the East African Rift tectonic margin. The structural concrete mix specified C35/20 with silica fume additives, reducing overall structural dead loads by 14% and speeding slab cycle times to just 9 days per floor.

  • Total Built-Up Area: 26,000 m² across 18 suspended levels
  • Basement Depth: 11.5 meters below ground level (3 basements)
  • Structural Steel & Rebar: 1,420 Tonnes Grade 500B
  • Concrete Volume: 8,600 m³ (Class 25 to Class 35)
  • Project Contract Value: KES 1.45 Billion